Quality CQV helps pharmaceutical and medical device manufacturers get equipment, utilities, processes and systems validated, documented and ready for inspection, using a practical, risk-based approach.
From the first user requirement to the signed summary report, Quality CQV can lead the whole lifecycle or take on a defined package of work alongside your own team. Documentation is written to stand up to EU GMP, MHRA and FDA scrutiny, and sized to the risk rather than to habit.
Validation master plans, schedules, resourcing and contractor management for new facilities, expansions and site-wide programmes.
Protocols, execution and reports for process equipment, clean utilities, HVAC and cleanrooms, leveraging commissioning and FAT/SAT evidence where it is justified.
System impact assessments, FMEAs and risk files that drive the test scope, for pharmaceutical processes and medical devices alike.
Process validation and supporting documentation for device manufacture, prepared for audits under ISO 13485 and FDA quality system requirements.
Risk-based validation of control and data systems, with access control, audit trail and data integrity testing built in.
Reviews of existing validation packages, periodic reviews, and fixing gaps found in audits before the inspector finds them.
Every test exists because a requirement or a risk calls for it, and every requirement can be followed to the evidence that proves it. That is what inspectors look for, and it keeps projects from testing what doesn't matter.
Write clear, testable user requirements and set the validation strategy in the master plan.
Rate GMP impact and run the risk assessment, so effort goes where product quality and patient safety depend on it.
Execute IQ, OQ and PQ with good documentation practice, handling deviations as they arise.
Close out with a traceability matrix and summary report, and hand over a system that stays in its validated state.
Quality CQV is led by Les Gilbert, a commissioning, qualification and validation specialist with a background across pharmaceutical and medical device manufacturing.
Ran commissioning and validation for the site, managing all C&V staff, with up to 50 contractors at a time.
Led risk management for a video and fibre-optic intubation bougie, a medical device used in airway management.
Editable Word templates for the core validation lifecycle, written from real project experience. Each has guidance notes, worked examples and Quality CQV formatting, ready to adapt to your own quality system.
| No. | Template |
|---|---|
| T01 | Validation Master Plan |
| T02 | User Requirements Specification |
| T03 | Risk Assessment (FMEA) |
| T04 | Installation Qualification protocol |
| T05 | Operational Qualification protocol |
| T06 | Performance Qualification protocol |
| T07 | Validation Summary Report |
| T08 | Requirements Traceability Matrix |
Validation of Pharmaceutical Systems sets out how to plan, execute and document validation in pharmaceutical manufacturing, drawing on years of running site programmes.
It is being prepared for publication in A4 and 6×9 inch editions.
Get in touch to be told when it is available.
Whether you need a full CQV programme led, a set of protocols written and executed, or a second pair of eyes on a validation package before an inspection, get in touch for an initial conversation.
Available for contract and consultancy work across the UK.